summaryrefslogtreecommitdiffstats
path: root/templates/tests
AgeCommit message (Collapse)AuthorFilesLines
2019-02-07Update CI test planKhouloud Touil1-0/+3
Update the CI test plan to add the CAN tests for devices with tag "can". Change-Id: I8f0a583787b60d9f3f2a4c21848da43f1891f612 Signed-off-by: Khouloud Touil <ktouil@baylibre.com>
2019-01-30Remove attr/aclKhouloud Touil2-2/+2
The attr and acl parameters are causing jobs failure each time, so for now we are removing them from the ci.jinja2 and release.jinja2 files Change-Id: I7ef6f5cb8143fb1687aa955a88a913146940af58 Signed-off-by: Khouloud Touil <ktouil@baylibre.com>
2019-01-24templates/tests: add DEVICE_TAGS parameterKhouloud Touil2-0/+4
Insert the board tags dynamically as parameters in the release.jinja2 and the ci.jinja2 files while generating the test template. Change-Id: Ic89323b673fa99a28266a2ac89382fd3f7d9899f Signed-off-by: Khouloud Touil <ktouil@baylibre.com>
2018-12-19templates/tests: switch ptest wrapperguppy_6.99.3guppy/6.99.36.99.3Kevin Hilman2-6/+20
Switch from custom AGL ptest wrapper to Linaro ptest wrapper which is more maintained and is more actively used and developed. Note that for now, both CI and release templates are doing a subset of ptests, which are now listed in the test definition, and not in a separate script. Change-Id: Ibfaa72443b19c35152db69223df709269d2b668f Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-12-18templates/tests/can: increase timeout for CAN testsCorentin LABBE1-1/+1
3 minutes are too short for CAN tests, upgrade timeout to 10. Fixes: SPEC-1842 Change-Id: Ieb60f706959ea154301a5f6a332abc6671211f5d Signed-off-by: Corentin LABBE <clabbe@baylibre.com>
2018-12-05templates/test: add starter release test planKevin Hilman1-0/+25
This is the testplan that will be used whenever --build-type=release. For starters, this is the same as the ci test plan. Change-Id: Ic7a83d683c6df8e2b3eb3b1db94d25ef906dbf48 Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-12-03templates/tests: increase timeout for ptestsKevin Hilman1-0/+2
Change-Id: Ia91512e66e89a05e0b52482b47d07539a444c378 Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-12-03templates/tests: move to standard test plansKevin Hilman2-23/+0
Remove specific test-plan templates, and migrate to the build-specific templates: ci, snapshot, release. Note that the contents of smoke and yocto-ptest are now part of the "ci" template. Change-Id: I982529ecafddd903db5954af03af15ac8d4f871a Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-12-03templates/tests: add test template for CI jobsKevin Hilman1-0/+23
Rather than specifing the list of test suites on the command-line, instead use a new "ci" template for all the test-suites to run for CI jobs. For starters, it combines what is currently in "smoke" and "yocto-ptest" While at it, add the "history: False" property so that the .git directory is not included in the overlay tarball that is downloaded by the target device. Change-Id: Ibf53dfb035d306cf2f40b73b3c7fc15dc6e78b58 Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-11-16Disable full ptest run due to failuresJan-Simon Möller1-8/+0
All available ptests currently will fail to run. We need to select. Change-Id: I9aa6d4b233aa9e78163cfb80235386288c0b47b3 Signed-off-by: Jan-Simon Möller <jsmoeller@linuxfoundation.org>
2018-10-12Increase timeout for ptestsJan-Simon Möller1-1/+1
the emulated runs (qemu*) take quite some time. Extend the timeout. Change-Id: I9fc924930655d11902fa3e7b224f5239af58d594 Signed-off-by: Jan-Simon Möller <jsmoeller@linuxfoundation.org>
2018-10-09Add full ptest run for all installed ptestsJan-Simon Möller1-0/+8
Change-Id: I2c22cfc01e1f0da1c0891a886ea505cfb4bff4ce Signed-off-by: Jan-Simon Möller <jsmoeller@linuxfoundation.org>
2018-10-06tests/yocto-ptest: increase timeout to 30mKevin Hilman1-1/+1
Change-Id: I67c8b924a367dec280b3b1acdb72522d0c2e7845 Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-10-04templates/tests: remove health-testKevin Hilman1-21/+0
This test suite is no longer useful as the smoke tests are now serving this purpose. Change-Id: I3c7165f34a9e5f4db2ec0010da13a793cf5dfdda Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-09-28Extend timeouts, add callback and gitignoreJan-Simon Möller1-0/+2
Change-Id: Ib28d25e1efd0033458fa9ae787610a8de9f5d275 Signed-off-by: Jan-Simon Möller <jsmoeller@linuxfoundation.org>
2018-07-16tests/health-test: remove always-failflounder_5.99.4flounder_5.99.3flounder_5.99.2flounder/5.99.4flounder/5.99.3flounder/5.99.25.99.45.99.35.99.2Kevin Hilman1-4/+1
Remove the always-fail test as it just creates false fail noise in the test results. Change-Id: I0389f8305fc97a6f9cc3d81c62ad31f8da496f0d Signed-off-by: Kevin Hilman <khilman@baylibre.com>
2018-07-03Test template for CAN interfaceskhouloud touil1-0/+9
Add new test template for CAN bus interfaces Change-Id: I9ef213afd2bbb3bd2115735821b15ac599f50bca Signed-off-by: khouloud touil <ktouil@baylibre.com>
2017-10-20Add the yocto-ptest definitionlollivier1-0/+6
Add the yocto-ptest definition to the pool of scripts. Depends on https://gerrit.automotivelinux.org/gerrit/#/c/11407/ Bug-AGL: SPEC-911 Change-Id: I7fe474ae7d3a06851ed4052151f68a566963edc9 Signed-off-by: lollivier <lollivier@baylibre.com>
2017-10-05Merge health tests into oneLoys Ollivier3-43/+24
Merge the two health tests into one unique. Change-Id: I59f55d282338eee507d490e5d70d96c9b5023d37 Signed-off-by: Loys Ollivier <lollivier@baylibre.com>
2017-09-22[Test] Add service test definitionLoys Ollivier1-1/+4
Add a new test definition. This test checks wether a list of services is running on the platform and reports the result for each service. Change-Id: I433da8387edd7c066296e1b4966ba867da58d239 Signed-off-by: Loys Ollivier <lollivier@baylibre.com>
2017-09-01initial snapshot: LAVA job creation based on templatesKevin Hilman3-0/+55
Change-Id: I5d545d3531f4c4190453724738076bd4eddfc4d6 Signed-off-by: Jerome Brunet <jbrunet@baylibre.com> Signed-off-by: Loys Ollivier <lollivier@baylibre.com> Signed-off-by: Kevin Hilman <khilman@baylibre.com>